ID: 9373
Navy & Grey Adjustable Field Head collar Halter & Grey Long Leadrope - Size Full
Keine Angebote gepostet.
Beschreibung
Navy Adjustable Head collar - size FULL
& Grey Long Leadrope
Have been washed since photos. A little tatty but do the job perfectly fine.
Collection from North Cardiff or can post for additional £2.99